Pole logistique de l'Europe du sud
Back home
Back home
Eurocentre specifications sheet

 

 

 

 

 

 

 

 

 

 

Print
Top page

 

Specifics Surface and activity zones Surface and activity zones Zone reglementation (see reglementation and P.A.Z (Development plan)) Taxes Telecommunications Electricity Gas Water Railway

Specifics Specifics

Direct access from the A.62 by the EUROCENTRE interchange
Direct trains routes from the primary SNCF railway line
Service centre (petrol station, washing, restaurants, truck parking,…).




Surface and activity zones Surface and activity zones

Total surface of the site : 300 hectares including :
200 hectares of commerciable surface
truck infrastructures, railroad and 100 hectares of natural area.

Zone S1 : Industrial activities and logistics covering 131 hectares
Zone S2 : Service industries and activities covering 34 hectares
Zone S3 : Services and business covering 10 hectares
Zone S5 : Stocking activities and free space covering 25 hectares
Zone ND : Natural space covering 25 hectares

Plots determined according to demand.

Topography : flat land

Top page


Adhesion to professional logistics associations Adhesion to professional logistics associations

EIA (European Intermodal Association). European Association regrouping the largest operators of combined transport and multimodal.

ASLOG (Association Française pour la Logistique). French Logistics Association.



Zone reglementation (see reglementation and P.A.Z (Development plan)) Zone reglementation (see reglementation and P.A.Z (Development plan))

Zone S1 :14 meters high
12% natural space
parking activities : 1 spot for 50-150m2 of SHON according to the activity
office parking : 1 splot for 25m2 of SHON

Zone S2 :14 meters high
25% natural space
office parking : 1 splot for 25m2 of SHON

Zone S3 :16 meters high
12% natural space
office parking : 1 splot for 25m2 of SHON


Taxes Taxes

Professional tax : community tax 14.5%
Local equipment tax : exemption on the zone
Charge for being connected to drain : exemption on the zone

Top page

Telecommunications Telecommunications

All possibilities for being connected to the France Télécom networks.

Electricity Electricity

B.T. capacity up to 100 KVA
from 101 to 250 KVA : analysis of users needs
beyond 250 KVA : installation of a private post
No power problems on Eurocetre
All specifics concerning the electric installation on the site are studied with the users.

Gas Gas

City gas powers the site. Pressure= 4 bars.

Top page

Water Water

AEP : output= minimum 4 liters/sec
Pressure= 5 bars

Water source : Saint Caprais factory

WASTE WATER :
The zone is equipped with a sewer system.
Rejected water is integrated directly by the land, following purification ordinances

INDUSTRIAL WASTE WATER :
Possible rejection after treatment by users following purification ordinances.

WATER PURIFICATION ONSITE :
1500 eq/per of existing equipment achieving thereafter 5000 eq/per.

RAIN WATER
Equipped with water decanters to prevent accidental pollution


  Railway Railway

60% of the land is embranchable
Automatic access branch-lines for complete trains northwards and southwards
Shunting lines to serve users (three 800m tracks)